Get a Quote. (660)438-5300

PORTFOLIO

Climalock Products and Processes

Part of the beauty and resilience of Climalock insulated tank panels is in the precision and care of the build, as well as the pride and precautions we take during the installation. And you’ll be glad to hear you can maintain operation during installation with minimal or no downtime.

Climalock Products

Climalock Process: From Quote to Completion

One-on-one consultation
One point of contact (present at your install)
Compressed project timelines
Product is beautifully shrink-wrapped when it shows up on-site (no paper, cardboard or other packaging blowing around on your job site)
Two daily install update/status meetings (AM and PM)
Installation and full inspection and walkaround
Complete "without a trace" cleanup
Periodic follow-ups

Climalock Safety Precautions

OSHA Logo
MSHA logo
ISNET Data Provider

What Customers Are Saying

We've worked with Climalock for many years on various storage tank projects. Brent and his team of tradesmen are first-class from the moment a project begins through installation. They are always top-notch professionals and ensure all of the details are covered so there are no project delays. Climalock’s agility in the field allows them to honor last-minute alteration requests without hesitation. I highly recommend Climalock for any storage tank project that requires insulation.
Jamie Reber, CEO
FORGE-Global